Ichthys LNG cost blows out another $US5 billion (2024)

The cost of the Ichthys LNG project has jumped again to $US45 billion ($62.6 billion) as junior partner Total sells down to operator Inpex.

The French oil and gas giant will sell a 4 per cent interest in the Darwin-based project to Inpex for $US1.6 billion.

Inpex has supplied Total a final cost estimate for the project of $US45 billion.

Total exploration and production president Arnaud Mr Breuillac yesterday said Total sold the equity to reduce the amount of capital it had allocated to Ichthys.

The Ichthys project was approved in early 2012. It was set to cost $US34 billion and start production in 2017.

“Ichthys is part of a wave of Australian LNG projects, which have unfortunately experienced major cost overruns and delays during their construction phase,” he said.

Two huge offshore vessels Inpex had constructed in Korea did not arrive on location off the Kimberley coast until mid-last year, making production in 2017 extremely difficult.

There were also significant delays in commissioning the vessels, and dangerous electrical work forced offshore oil and gas safety regulator NOPSEMA to intervene several times.

The construction of the LNG plant in Darwin was plagued by billion-dollar contractual disputes and a tragic death in late 2017.

An Inpex spokesman said several per cent of the latest 12.5 per cent cost increase was due to costs to start up production.

Inpex has started producing gas at the $54 billion Ichthys liquefied natural gas project off northern Australia, a major milestone for the long-delayed project.

He said the rest of the increase was due to capital expenditure after start-up that may extend for a year or more.

WestBusiness understands that significant rectification work is required on aspects of the Darwin plant.

The first condensate and LNG shipments left Ichthys in October.

The sale from Total to Inpex values the project at $US40 billion.

Inpex now owns 66.2 per cent of Ichthys, Total 26 per cent, and the remainder of the equity sits with five Japanese and one Taiwanese energy utility.

The Ichthys project is expected to operate for 40 years, producing 8.9 million tonnes of LNG, 1.6 million tonnes of LPG and 100,000 barrels of condensate a year.

Ichthys LNG cost blows out another $US5 billion (2024)
Top Articles
Entrepreneurship funds in Africa: distinguishing the good from the bad
Is there a link between ADHD and spectacular financial failures? | Laurence O'Dwyer
Bm1 Bus Tracker
Vaathi Movie Download Masstamilan
Otr Cross Reference
6465319333
Apex Reactive Skins
Aldi Vs Costco: All Your Questions Answered
Aldi Nearme
How to Write The New Twitter 𝕏 Logo - Hypefury
Aes Salt Lake City Showdown
Osceola (U.S. National Park Service)
Cape Girardeau Mo Inmate Roster
Richard Sambade Obituary
Jumble Baltimore Sun
Maaco Ann Arbor
Qr 0738
Tesla Holiday Update 2023.44.30.1 Includes FSD Beta 11.4.9 - TeslaNorth.com
Wmlink/Sspr
Wieting Funeral Home '' Obituaries
Methstreams Boxing Stream
What Is The Best Center Build In 2K23
Apartments / Housing For Rent near Trenton, NJ - craigslist
Shell Shockers Online Unblocked
Atlanta Braves Logo - Logo, zeichen, emblem, symbol. Geschichte und Bedeutung
Keyc Weather Forecast
Ohio Road Construction Map
Kitco Silver Charts
Nail Salon Goodman Plaza
Metro 72 Hour Extension 2022
Amerideck Cost
Fine Food Fan Crossword Clue
Craigslist Louisiana Cars And Trucks - By Owner
Rinehart Sons Funeral Home
Huniepop Jessie Questions And Answers
Brett Cooper Wikifeet
Covenant Funeral Service Stafford Obituaries
Huff Lakjer Funeral Home
George The Animal Steele Gif
Student Doctor Network Anesthesia
Ixl Ld Northeast
Ralphs Labor Day Hours
149 Capstone Project Ideas & Examples – 2024
Hyvee Workday
Willow Returns 34 Years Later in an Exciting New Series on Disney+
Craiglist Quad Cities
Rex Parker 10/8/22
Chris Medlin: Credits, Bio, News & More | Broadway World
Eufy Update Firmware
Rosalina Katrina Anderson
Lovein Funeral Obits
Ios Unblocked Games
Latest Posts
Article information

Author: Foster Heidenreich CPA

Last Updated:

Views: 5939

Rating: 4.6 / 5 (56 voted)

Reviews: 87% of readers found this page helpful

Author information

Name: Foster Heidenreich CPA

Birthday: 1995-01-14

Address: 55021 Usha Garden, North Larisa, DE 19209

Phone: +6812240846623

Job: Corporate Healthcare Strategist

Hobby: Singing, Listening to music, Rafting, LARPing, Gardening, Quilting, Rappelling

Introduction: My name is Foster Heidenreich CPA, I am a delightful, quaint, glorious, quaint, faithful, enchanting, fine person who loves writing and wants to share my knowledge and understanding with you.